#21
|
|||
|
|||
More work on the fin section. Since the fins are glassed balsa and tacked down with 5 min epoxy...I decided to glass them down. If you don't make a mess...you too can glass on the kitchen counter. Lots of sanding and fill to come.
|
#22
|
|||
|
|||
I sanded enough to apply primer. Then fill, sand and so on.
|
#23
|
|||
|
|||
Work on the LEM Shroud/ Command Mudule Stack
Various parts laid out. 3" Loc tube, cut down 5.38 tube coupler, 5.38 stiffy tube section, and centering rings. |
#24
|
|||
|
|||
Centering ring mounted flush to the bottom of the Loc 3" tube. T-nuts installed.
|
#25
|
|||
|
|||
Assembly tacked with CA. The bottom plate was added to recess the centering ring and then removed before epoxy was applied.
|
#26
|
|||
|
|||
I glued 2 centerings together. One fits inside the stiffy tube and the other is beveled to accept the shroud.
|
#27
|
|||
|
|||
The shroud was added and since it is just made out of poster board...I decided to give it 1 wrap of 4oz cloth and West Systems.
|
#28
|
|||
|
|||
Here's the last couple of shots for the day.
A shot of the bottom plate. I'll be able to access the nose cone to adjust the CG. All glassed and sanded to date. |
#29
|
|||
|
|||
Work Update.....
The wraps were applied and all the little fidgity bits were made and glued in place. |
#30
|
|||
|
|||
Positions 1,2,3 and 4.
|
Thread Tools | Search this Thread |
Display Modes | |
|
|