Ye Olde Rocket Forum

Go Back   Ye Olde Rocket Forum > Work Bench > Projects
User Name
Password
Auctions Register FAQ Members List Calendar Today's Posts Search Mark Forums Read


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 03-31-2021, 03:48 PM
Blastfromthepast Blastfromthepast is offline
'nother Old Fart BAR....
 
Join Date: Dec 2011
Location: Castle Rock, Colorado
Posts: 381
Default Orbital Transport Build Completed

Hi, Folks,
Just put the final touches on a long-running scratch-built Orbital Transport project. I started work on this one in 2018. I'm kinda slow!

More details and pictures at this link to the ol' blog:

https://castlerocketeer.blogspot.co...-transport.html
Attached Thumbnails
Click image for larger version

Name:  OT 1.PNG
Views: 58
Size:  313.8 KB  Click image for larger version

Name:  OT 5.PNG
Views: 48
Size:  733.4 KB  
__________________
Just remember...G. Harry Stine's first ever model rocket was an RTF !

Check out my wonderful model rocketry blog here:
https://castlerocketeer.blogspot.com/
Reply With Quote
  #2  
Old 03-31-2021, 04:15 PM
Earl's Avatar
Earl Earl is offline
Apollo Nut
 
Join Date: Dec 2006
Posts: 4,921
Default

That really turned out well! If you hadn’t said it was a scratch build, I don’t think anyone would have known.

Don’t feel badly about your construction timeline. I’ve got several that are sitting at 6-7 years and still in primer. Others that are at 2-3 years. I probably have 10-12 builds going at any one time and sometimes I have issues weather wise with getting optimal opportunities for painting (high humidity primarily). When that is the case, I press on with another build and wind up with a ‘paint finishing’ backlog.

I suspect I’m probably not the only one who suffers from that.

Earl
__________________
Earl L. Cagle, Jr.
NAR# 29523
TRA# 962
SAM# 73
Owner/Producer
Point 39 Productions

Rocket-Brained Since 1970
Reply With Quote
  #3  
Old 03-31-2021, 06:36 PM
Blastfromthepast Blastfromthepast is offline
'nother Old Fart BAR....
 
Join Date: Dec 2011
Location: Castle Rock, Colorado
Posts: 381
Default

Thanks!
I'm happy to learn that I am not the only one who takes long build times.
__________________
Just remember...G. Harry Stine's first ever model rocket was an RTF !

Check out my wonderful model rocketry blog here:
https://castlerocketeer.blogspot.com/
Reply With Quote
  #4  
Old 03-31-2021, 09:08 PM
ghrocketman's Avatar
ghrocketman ghrocketman is offline
President, MAYHEM AGITATORS, Inc.
 
Join Date: Jul 2005
Location: Nunya Bizznuss, Michigan
Posts: 13,486
Default

I have a Semroc 1/70 Saturn 1B that has been 85% done since about 2007.
__________________
When in doubt, WHACK the GAS and DITCH the brake !!!

Yes, there is such a thing as NORMAL
, if you have to ask what is "NORMAL" , you probably aren't !

Failure may not be an OPTION, but it is ALWAYS a POSSIBILITY.
ALL systems are GO for MAYHEM, CHAOS, and HAVOC !
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump



All times are GMT -5. The time now is 11:57 PM.


Powered by: vBulletin Version 3.0.7
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Ye Olde Rocket Shoppe © 1998-2024