01-26-2006, 08:59 PM
|
The_Ripper
|
|
Join Date: Jun 2005
Location: Louisiana
Posts: 1,941
|
|
Quote:
Originally Posted by snaquin
My 1340 with the large payload section is still on the bench and has the lower egg capsule transition modified to fit Semroc LT-125 tubing. I'll post some new pics of that 1340 in this thread when I have more progress but there are a few pics in the egg crate thread.
|
Finished this one tonight except for a few minor interior details. Semroc tubes, centering rings and motor mount with Pratt braided kevlar for the shock cord bridle. No paint on the airframes. I used self-adhesive monokote for the white, gold and black stripe. Has a basswood stand-off on the back side with K&S 5/16" thin wall brass tubing to slide over a 1/4" launch rod. 29mm motor mount in this one to feed it a few large motors at the next launch.
__________________
Steve Naquin
TRA# 677 L2
NAR# 85518 L2
SAM# 0052
🚀 In Construction: Der Blue Maxx/Minie-Magg 5.5” & Vander-Burn MDRM Clone w/Stickershock23 Custom Decals
🚀 In Paint & Detail: USR Banshee
🚀 In Build Queue: Estes Doorknob w/Vander-Burn Rocketry Upgrade Kit [Sport Decor], Semroc Centurion-F, Semroc Egg Crate
🚀 In Repair: SLS Lil’ Hustler, SLS Aero-Dart 1969 Trim
🚀 Stay Tuned For Fall 2021 Launch Dates
|